{"id":2383,"date":"2011-09-21T09:37:00","date_gmt":"2011-09-21T02:37:00","guid":{"rendered":"https:\/\/vinata.dienngo.com\/?p=2383"},"modified":"2025-11-11T14:23:49","modified_gmt":"2025-11-11T07:23:49","slug":"groundbreaking-ceremony-of-pedv-factory-construction","status":"publish","type":"post","link":"https:\/\/vinata.com.vn\/en\/groundbreaking-ceremony-of-pedv-factory-construction\/","title":{"rendered":"Ground Breaking Ceremony for construction of the PEDV Factory"},"content":{"rendered":"\n<h2 class=\"gsbp-de29012\">Ground Breaking Ceremony for construction of the PEDV Factory<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/vinata.com.vn\/wp-content\/uploads\/2025\/07\/20130406_PEDV-scaled.jpg\" alt=\"\" class=\"wp-image-1924\" srcset=\"https:\/\/vinata.com.vn\/wp-content\/uploads\/2025\/07\/20130406_PEDV-scaled.jpg 2560w, https:\/\/vinata.com.vn\/wp-content\/uploads\/2025\/07\/20130406_PEDV-768x576.jpg 768w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p class=\"has-palette-color-11-color has-text-color has-link-color wp-elements-807094893010ee43721376ee1abf7d2d\">On September 21, 2011, the construction of the Panasonic Electronics Devices Vietnam (PEDV) Factory officially commenced, with VINACONEX &#8211; TAISEI International Limited Liability Company (VINATA) serving as the main contractor.<\/p>\n\n\n\n<p class=\"has-palette-color-11-color has-text-color has-link-color wp-elements-7e39313bdd73d341cde7db438971292a\">The project is located in Thang Long Industrial Park, Dong Anh, Hanoi, covering a construction area of 14,213 m\u00b2 with an initial total value of USD 16.9 million.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On September 21, 2011, the construction of the Panasonic Electronics Devices Vietnam (PEDV) Factory officially commenced, with VINACONEX &#8211; TAISEI International Limited Liability Company (VINATA) serving as the main contractor. The project is located in Thang Long Industrial Park, Dong Anh, Hanoi, covering a construction area of 14,213 m\u00b2 with an initial total value of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1925,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":".gsbp-97c9c8e{color:var(--wp--preset--color--palette-color-11, var(--theme-palette-color-11, #4c4c4c))}","footnotes":""},"categories":[14],"tags":[],"class_list":["post-2383","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts\/2383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2383"}],"version-history":[{"count":4,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts\/2383\/revisions"}],"predecessor-version":[{"id":7935,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts\/2383\/revisions\/7935"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/media\/1925"}],"wp:attachment":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2383"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2383"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}