{"id":7786,"date":"2019-01-29T13:19:00","date_gmt":"2019-01-29T06:19:00","guid":{"rendered":"https:\/\/vinata.com.vn\/?p=7786"},"modified":"2025-11-10T13:26:24","modified_gmt":"2025-11-10T06:26:24","slug":"ground-breaking-ceremony-of-vietnam-nisshin-technomic-premix-new-factory-project-2","status":"publish","type":"post","link":"https:\/\/vinata.com.vn\/en\/ground-breaking-ceremony-of-vietnam-nisshin-technomic-premix-new-factory-project-2\/","title":{"rendered":"Ground breaking ceremony of Vietnam Nisshin Technomic Premix New Factory Project"},"content":{"rendered":"\n<h2 class=\"gsbp-e8fb0db\">Ground breaking ceremony of Vietnam Nisshin Technomic Premix New Factory Project<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/vinata.com.vn\/wp-content\/uploads\/2025\/07\/Nissin.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p class=\"has-palette-color-11-color has-text-color has-link-color wp-elements-3ca091c8fd8834023969c917f7011fc3\">On 29<sup>th<\/sup>\u00a0January 2019, the Ground breaking ceremony of\u00a0<strong>Vietnam Nisshin Technomic Premix New Factory Project<\/strong>\u00a0took place at Lot 517, Road 13, Long Binh Industrial Park (Amata), Long Binh Ward, Bien Hoa City, Dong Nai Province, Vietnam. The Project&#8217;s owner is\u00a0<strong>Vietnam Nisshin Technomic Co., Ltd.<\/strong>\u00a0Total construction area is 8,056 m<sup>2\u00a0<\/sup>and the Project is expected to be completed within October of 2019.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 29th\u00a0January 2019, the Ground breaking ceremony of\u00a0Vietnam Nisshin Technomic Premix New Factory Project\u00a0took place at Lot 517, Road 13, Long Binh Industrial Park (Amata), Long Binh Ward, Bien Hoa City, Dong Nai Province, Vietnam. The Project&#8217;s owner is\u00a0Vietnam Nisshin Technomic Co., Ltd.\u00a0Total construction area is 8,056 m2\u00a0and the Project is expected to be completed [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1783,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":".gsbp-905fa78{color:var(--wp--preset--color--palette-color-11, var(--theme-palette-color-11, #4c4c4c))}","footnotes":""},"categories":[14],"tags":[],"class_list":["post-7786","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts\/7786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/comments?post=7786"}],"version-history":[{"count":1,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts\/7786\/revisions"}],"predecessor-version":[{"id":7787,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/posts\/7786\/revisions\/7787"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/media\/1783"}],"wp:attachment":[{"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/media?parent=7786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/categories?post=7786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinata.com.vn\/en\/wp-json\/wp\/v2\/tags?post=7786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}